Earned Value Add-In 1.1 Download

fyxm network: our download portal - Softliste.de
Earned Value Add-In
        Bookmark and Share
  • Name:Earned Value Add-In
  • License:GPL
  • Developer:Bob Segrest
  • Downloads:60
  • Rating:n/a
  • OS:Windows 2K / XP / 2003 / Vista / 2008
  • Size:464 KB
  • D.M.C.A. 
  • Download > 

Earned Value Add-In 1.1

Earned Value Add-In 1.1 Description:

The Earned Value Add-In was designed as a tool to help project managers assess and visualize projects using earned value analysis.

The Earned Value Add-In is written in VB.Net using Visual Studio Tools for Office (VSTO) and built in Microsoft Visual Studio 2008. It is deployed as an Add-In forMicrosoft Office Project 2007.

Earned Value Add-In 1.1 Requirements:

· Visual Studio Tools for the Office system 3.0 Runtime

Related:

add text - add in msn - add url - access add in - exchange add in - add remove plus

Related searches:

project risk analysis

Earned Value Add-In security information

You cannot download any crack or serial number for Earned Value Add-In on this page. Every software that you are able to download on our site is legal. There is no crack, serial number, hack or activation key for Earned Value Add-In present here. Our collection also doesn't contain any keygens, because keygen programs are being used in illegal ways which we do not support. All software that you can find here is freely downloadable and legal.

Earned Value Add-In installation package is prepared to be downloaded from our fast download servers. It is checked for possible viruses and is proven to be 100% clean and safe. Various leading antiviruses have been used to test Earned Value Add-In, if it contains any viruses. No infections have been found and downloading Earned Value Add-In is completelly problem free because of that reason. Our experts on malware detection tested Earned Value Add-In with various spyware and malware detection programs, including fyxm.net custom malware and spyware detection, and absolutelly no malware or spyware was found in Earned Value Add-In.

All software that you can find on our servers, including Earned Value Add-In, is either freeware, shareware or open-source, some of the software packages are demo, trial or patch versions and if possible, we also host official full versions of software.

Because we want to be one of the fastest download sites on the web, we host all the software including Earned Value Add-In on our servers. You cannot find here any torrents or download links that would lead you to dangerous sites.

Fyxm.net does support free software, however we do not support warez or illegal downloads. Warez is harming producers of the software.

Enjoy!

Rate Earned Value Add-In 1.1!

Rating: 0.0/5 (0 votes cast)

Similar Programs License Size Rating  
Add Your Link Freeware 492 KB 2 / 5
Add to 30Boxes Freeware 19 KB 0 / 5
Add-Art Freeware 6.4 MB 1 / 5
Appriver Add-in Freeware 3.7 MB 2 / 5
Add Folder Shareware 244 KB 1 / 5

Featured Products

LimeWire 5.2.1 Beta / 5.1.3

LimeWire

Share computer files with anyone on the internet!

Kaspersky Anti-Virus Personal 2010

Kaspersky Anti-Virus Personal

BKaspersky AV provides all types of anti-virus protection

Winamp 5 Full

Winamp

A flexible and sophisticated application for playing and managing your music

DAEMON Tools Lite 4.30.4

Daemon Tools

Advanced application for multiprotection emulation

CMS Templates Download

Blogger Themes

Check our website devoted to CMS themes download
FYXM.net - We have everything! If not - please do contact us here.